Two kinds of evidence. Things I wrote and still maintain, and systems I scoped and commissioned.

Delivered

Systems I scoped, procured and commissioned. The scale is the part that is hard to fake.

Multi-site CCTV control room

2026

Ninety cameras across thirteen construction sites, monitored live from one room by one operator.

Every site connects over 4G behind carrier-grade NAT, so no inbound port forwarding is possible. Built on outbound P2P instead, with live sub-streams tuned for the worst case mobile link and a video wall laid out by risk rather than by site.

Read the case study
90cameras
13sites
8screens
1operator

Solaris 8 plant recovery

2026

Recovery and stabilisation of an Ammann AS2000 asphalt plant control system running on SunOS 5.8.

Rebuilt a corrupted System V startup chain from init through rc2.d to S99uag, restored the application environment, and resolved shared memory, permission and watchdog faults behind a respawn loop. No vendor support, no rollback, and every restart a production decision.

Read the case study
0downtime after recovery
2000platform vintage

Isolated site network, Algeria

2026

Complete IT infrastructure for a highway construction site, built from nothing with no internet and no cloud.

Multi-VLAN network with router-on-a-stick routing, a Grandstream IP PBX registered across VLANs without Zero Config, a 24 TB NAS with role-based access for twenty-four users, and ONVIF surveillance. Designed to work with the outside link down, then connected.

Read the case study
5VLANs
20extensions
24TB storage
14cameras